BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management
Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2016-10-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | http://www.mdpi.com/2071-1050/8/11/1106 |