Variability of plant risk due to variable operator allowable time for aggressive cooldown initiation
Recent analysis results with realistic assumptions provide the variability of operator allowable time for the initiation of aggressive cooldown under small break loss of coolant accident or steam generator tube rupture with total failure of high pressure safety injection. We investigated how plant r...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2019-08-01
|
Series: | Nuclear Engineering and Technology |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1738573318307666 |