A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness

This research considers a two-stage assembly-type flowshop scheduling problem with the objective of minimizing the total tardiness. The first stage consists of two independent machines, and the second stage consists of a single machine. Two types of components are fabricated in the first stage, and...

Full description

Bibliographic Details
Main Authors: Ju-Yong Lee, June-Young Bang
Format: Article
Language:English
Published: Hindawi Limited 2016-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2016/6409321