Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time hori...

Full description

Bibliographic Details
Main Authors: Behnam Vahdani, Seyed Meysam Mousavi, Morteza Mousakhani, Hassan Hashemi
Format: Article
Language:English
Published: Islamic Azad University, Qazvin Branch 2016-11-01
Series:Journal of Optimization in Industrial Engineering
Subjects:
Online Access:http://www.qjie.ir/article_231_fdbecdaa0a38e1503786e935ebcb62d0.pdf