Analytical Calculation And FEM Analysis Main Girder Double Girder Bridge Crane
The cranes are now not replaceable mode of transport of materials and finished products both in production halls and in the open space. This paper made the whole analytical calculation of double girder bridge cranes to be used in laboratories exclusively for testing, determined by the maximum bendin...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
UIKTEN
2017-02-01
|
Series: | TEM Journal |
Subjects: | |
Online Access: | http://www.temjournal.com/content/61/TemJournalFebruary2017_48_52.pdf |