A single machine multi-job integer batch scheduling problem with multi due date to minimize total actual flow time
This research deals with a multi-job Integer batch scheduling problem on a single machine with different due dates. Every job demanded one or more parts, and the single machine processed the job into a number of batches. The objective is to minimize total actual flow time, defined as the to...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2021-01-01
|
Series: | Decision Science Letters |
Online Access: | http://www.growingscience.com/dsl/Vol10/dsl_2021_18.pdf |