Estimate of 3D power wall loads due to Neutral Beam Injection in EU DEMO ramp-up phase
Heating and current drive systems such as high energy Neutral Beam Injection (NBI) are being considered for pulsed EU DEMO (“DEMO1”) pre-conceptual design. Their aim is to provide auxiliary power, not only during flat-top, but also during transient phases (i.e. plasma current ramp-up and ramp-down)....
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2019-01-01
|
Series: | Nuclear Materials and Energy |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352179118300991 |