Payment Scheduling Problem with Multiple Modes for Activities to Maximize the Net Present Value of a Project
In this paper, the multimode payment scheduling project is studied, which aims to maximize the net present value (NPV) of a project by deciding on payments and the start times of its activities. The problem is formulated mathematically from the point of view of the selected contractor of the project...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/2354105 |