Payment Scheduling Problem with Multiple Modes for Activities to Maximize the Net Present Value of a Project
In this paper, the multimode payment scheduling project is studied, which aims to maximize the net present value (NPV) of a project by deciding on payments and the start times of its activities. The problem is formulated mathematically from the point of view of the selected contractor of the project...
Main Authors: | Somayeh Ghasedi, Behrouz Afshar-Nadjafi |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/2354105 |
Similar Items
-
An integrated project portfolio selection and resource investment problem to maximize net present value using genetic algorithm
by: Hamidreza Shahabifard, et al.
Published: (2016-10-01) -
A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption
by: Behrouz Afshar-Nadjafi
Published: (2018-07-01) -
An Exact Algorithm for the Mode Identity Project Scheduling Problem
by: Behrouz Afshar Nadjafi, et al.
Published: (2012-03-01) -
Resource Constrained Project Scheduling Subject to Due Dates: Preemption Permitted with Penalty
by: Behrouz Afshar-Nadjafi
Published: (2014-01-01) -
Scheduling A Resource Constrained Project To Maximize Its Net Present Value
by: Chen Shiuh-Ming, et al.
Published: (1998)