Monitored deformation data during the construction of an urban subway
The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and i...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-04-01
|
Series: | Data in Brief |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352340920300202 |