Monitored deformation data during the construction of an urban subway
The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and i...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-04-01
|
Series: | Data in Brief |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352340920300202 |
id |
doaj-68c3ce78de2c43e29228f788d6901035 |
---|---|
record_format |
Article |
spelling |
doaj-68c3ce78de2c43e29228f788d69010352020-11-25T03:00:29ZengElsevierData in Brief2352-34092020-04-0129Monitored deformation data during the construction of an urban subwayXiaotian Hao0Bin Wang1Hailong Wang2Shijiazhuang Tiedao University, China; ChongQing Technology and Business Institute, ChinaBeiwang Construction Group Co. LTD, ChinaHebei University of Architecture, China; Corresponding author.The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and it included monitoring points for ground subsidence, building settlement, vault deformation and the tunnel horizontal deformation. The deformation data in this article was measured using surveying in the site and it can be reused to validate numerical simulation results and guide the similar engineering project in the nearby area. Keywords: Tunnel, Monitoring, Subsidence, Deformation, Settlementhttp://www.sciencedirect.com/science/article/pii/S2352340920300202 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Xiaotian Hao Bin Wang Hailong Wang |
spellingShingle |
Xiaotian Hao Bin Wang Hailong Wang Monitored deformation data during the construction of an urban subway Data in Brief |
author_facet |
Xiaotian Hao Bin Wang Hailong Wang |
author_sort |
Xiaotian Hao |
title |
Monitored deformation data during the construction of an urban subway |
title_short |
Monitored deformation data during the construction of an urban subway |
title_full |
Monitored deformation data during the construction of an urban subway |
title_fullStr |
Monitored deformation data during the construction of an urban subway |
title_full_unstemmed |
Monitored deformation data during the construction of an urban subway |
title_sort |
monitored deformation data during the construction of an urban subway |
publisher |
Elsevier |
series |
Data in Brief |
issn |
2352-3409 |
publishDate |
2020-04-01 |
description |
The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and it included monitoring points for ground subsidence, building settlement, vault deformation and the tunnel horizontal deformation. The deformation data in this article was measured using surveying in the site and it can be reused to validate numerical simulation results and guide the similar engineering project in the nearby area. Keywords: Tunnel, Monitoring, Subsidence, Deformation, Settlement |
url |
http://www.sciencedirect.com/science/article/pii/S2352340920300202 |
work_keys_str_mv |
AT xiaotianhao monitoreddeformationdataduringtheconstructionofanurbansubway AT binwang monitoreddeformationdataduringtheconstructionofanurbansubway AT hailongwang monitoreddeformationdataduringtheconstructionofanurbansubway |
_version_ |
1724697894713294848 |