Monitored deformation data during the construction of an urban subway

The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and i...

Full description

Bibliographic Details
Main Authors: Xiaotian Hao, Bin Wang, Hailong Wang
Format: Article
Language:English
Published: Elsevier 2020-04-01
Series:Data in Brief
Online Access:http://www.sciencedirect.com/science/article/pii/S2352340920300202
id doaj-68c3ce78de2c43e29228f788d6901035
record_format Article
spelling doaj-68c3ce78de2c43e29228f788d69010352020-11-25T03:00:29ZengElsevierData in Brief2352-34092020-04-0129Monitored deformation data during the construction of an urban subwayXiaotian Hao0Bin Wang1Hailong Wang2Shijiazhuang Tiedao University, China; ChongQing Technology and Business Institute, ChinaBeiwang Construction Group Co. LTD, ChinaHebei University of Architecture, China; Corresponding author.The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and it included monitoring points for ground subsidence, building settlement, vault deformation and the tunnel horizontal deformation. The deformation data in this article was measured using surveying in the site and it can be reused to validate numerical simulation results and guide the similar engineering project in the nearby area. Keywords: Tunnel, Monitoring, Subsidence, Deformation, Settlementhttp://www.sciencedirect.com/science/article/pii/S2352340920300202
collection DOAJ
language English
format Article
sources DOAJ
author Xiaotian Hao
Bin Wang
Hailong Wang
spellingShingle Xiaotian Hao
Bin Wang
Hailong Wang
Monitored deformation data during the construction of an urban subway
Data in Brief
author_facet Xiaotian Hao
Bin Wang
Hailong Wang
author_sort Xiaotian Hao
title Monitored deformation data during the construction of an urban subway
title_short Monitored deformation data during the construction of an urban subway
title_full Monitored deformation data during the construction of an urban subway
title_fullStr Monitored deformation data during the construction of an urban subway
title_full_unstemmed Monitored deformation data during the construction of an urban subway
title_sort monitored deformation data during the construction of an urban subway
publisher Elsevier
series Data in Brief
issn 2352-3409
publishDate 2020-04-01
description The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and it included monitoring points for ground subsidence, building settlement, vault deformation and the tunnel horizontal deformation. The deformation data in this article was measured using surveying in the site and it can be reused to validate numerical simulation results and guide the similar engineering project in the nearby area. Keywords: Tunnel, Monitoring, Subsidence, Deformation, Settlement
url http://www.sciencedirect.com/science/article/pii/S2352340920300202
work_keys_str_mv AT xiaotianhao monitoreddeformationdataduringtheconstructionofanurbansubway
AT binwang monitoreddeformationdataduringtheconstructionofanurbansubway
AT hailongwang monitoreddeformationdataduringtheconstructionofanurbansubway
_version_ 1724697894713294848