Optimization of Hole Cleaning and Cuttings Removal in High Inclined Till Horizontal Well
The goal of this experimental study is to determine the effects of different parameters (Flow rate, cuttings density, cuttings size, and hole inclination degree) on hole cleaning efficiency. Freshwater was used as a drilling fluid in this experiment. The experiments were conducted by using flow loo...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Baghdad/College of Engineering
2020-03-01
|
Series: | Iraqi Journal of Chemical and Petroleum Engineering |
Subjects: | |
Online Access: | http://ijcpe.uobaghdad.edu.iq/index.php/ijcpe/article/view/810 |