PROBLEMS IN THE TUBING/PACKER SYSTEM
When gas and oil wells are completed and produced or treated through the tubing connected to packer, there is a great number of problems to be solved. Changes in temperatures and pressures that occure during various operations ussually result in changes in tubing lengths or tubing to packer forces,...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mining, Geology and Petroleum Engineering
1993-12-01
|
Series: | Rudarsko-geološko-naftni Zbornik |
Subjects: | |
Online Access: | http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=22274&lang=en |