Warm-start piecewise linear approximation-based solution for load pick-up problem in electrical distribution system
As the core sub-problem of both network reconfiguration and service restoration of the electrical distribution system (EDS), the load pick-up (LPP) problem in EDS searches the optimal configuration of the EDS, aiming to minimise the power loss or provide as much power as possible to load ends. The p...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-04-01
|
Series: | IET Smart Grid |
Subjects: | |
Online Access: | https://digital-library.theiet.org/content/journals/10.1049/iet-stg.2019.0194 |