Simultaneous Optimization of Block Replacement and Spare Part Ordering Time for a Multi Component System with Separate Spare Part Ordering for Block and Failure Replacements
A block replacement schedule can be optimized simultaneously with a spare parts ordering schedule, since all items are replaced at a constant interval. The solution of joint optimization for spare parts ordering time and block replacement gives lower costs compared to separate optimization of orderi...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
ITB Journal Publisher
2016-11-01
|
Series: | Journal of Engineering and Technological Sciences |
Subjects: | |
Online Access: | http://journals.itb.ac.id/index.php/jets/article/view/1943/1843 |