Technical Problems in the Renovation of Historic Bridges. Case Study – Road Bridge in Cigacice
The road bridge in Cigacice is a very good example of and testimony to the level of knowledge and skills in interwar engineering art. The bridge is almost 100 years old, put to use in 1925, and was designed and manufactured by Beuchelt & Co. in Zielona Góra. The bridge has 10 spans with a parabo...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2021-03-01
|
Series: | Civil and Environmental Engineering Reports |
Subjects: | |
Online Access: | https://doi.org/10.2478/ceer-2021-0005 |