The SPES radioactive ion beam project of LNL: status and perspectives

A new Radioactive Ion Beam (RIB) facility (SPES) is presently under construction at the Legnaro National Laboratories of INFN. The SPES facility is based on the ISOL method using an UCx Direct Target able to sustain a power of 8 kW. The primary proton beam is provided by a high current Cyclotron acc...

Full description

Bibliographic Details
Main Authors: de Angelis Giacomo, Prete G., Andrigetto A., Manzolaro M., Corradetti S., Scarpa D., Rossignoli M., Monetti A., Lollo M., Calderolla M., Vasquez J., Zafiropoulos D., Sarchiapone L., Benini D., Favaron P., Rigato M., Pegoraro R., Maniero D., Calabretta L., Comunian M., Maggiore M., Lombardi A., Porcellato A. M., Roncolato C., Bisoffi G., Pisent A., Galatà A., Giacchini M., Bassato G., Canella S., Gramegna F., Valiente J., Bermudez J., Mastinu P. F., Esposito J., Wyss J., Russo A., Zanella S.
Format: Article
Language:English
Published: EDP Sciences 2016-01-01
Series:EPJ Web of Conferences
Online Access:http://dx.doi.org/10.1051/epjconf/201610701001