Optimal Generation Start-Up Methodology for Power System Restoration Considering Conventional and Non-Conventional Renewable Energy Sources

Power system restoration must be accomplished as soon as possible after a blackout. In this process, available black-start (BS) units are used to provide cranking power to non-black-start (NBS) units so as to maximize the overall power system generation capacity. This procedure is known as the gener...

Full description

Bibliographic Details
Main Authors: Ricardo Andrés Pardo-Martínez, Jesús M. López-Lezama, Nicolás Muñoz-Galeano
Format: Article
Language:English
Published: MDPI AG 2021-09-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/11/17/8246