Pre-design inspection of the long-term operation lock

For hydraulic structures of long-term operation, assessments of operating life, limit states and safety of structures are required. The design of reconstruction, restoration of functional parameters of structures is preceded by pre-design inspections of the structure. The relevance of pre-design ins...

Full description

Bibliographic Details
Main Authors: Frishter Lyudmila, Isaikin Alexander
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_05018.pdf