Settlement of Geosynthetic Encased Stone Columns Liquefaction Condition in Box Culvert

When the box culvert system is placed on a sandy soil layer with a relatively low bearing capacity and is disposed to potential liquefaction, the soil layer must be repaired to avoid damages to the box culvert structure. The proposed method is Geosynthetic Encased Stone Columns (GESC) to increase th...

Full description

Bibliographic Details
Main Authors: Maftuh Ahnan, Putera Agung Maha Agung
Format: Article
Language:Indonesian
Published: Politeknik Negeri Bali 2021-03-01
Series:Logic
Subjects:
Online Access:http://ojs.pnb.ac.id/index.php/LOGIC/article/view/2259/1663