Settlement of Geosynthetic Encased Stone Columns Liquefaction Condition in Box Culvert
When the box culvert system is placed on a sandy soil layer with a relatively low bearing capacity and is disposed to potential liquefaction, the soil layer must be repaired to avoid damages to the box culvert structure. The proposed method is Geosynthetic Encased Stone Columns (GESC) to increase th...
Main Authors: | , |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Politeknik Negeri Bali
2021-03-01
|
Series: | Logic |
Subjects: | |
Online Access: | http://ojs.pnb.ac.id/index.php/LOGIC/article/view/2259/1663 |