Testing cable system reliability after commissioning and during operation life: in medio stat virtus?

Abstract Quality control, commissioning and diagnostic tests on insulation systems of electrical apparatus are necessary to reduce the failure risk under operation, eliminate infant mortality failures and reduce the impact of ageing on insulation system reliability. This study tries to establish a p...

Full description

Bibliographic Details
Main Authors: Gian Carlo Montanari, Paolo Seri, Riddhi Ghosh, Stefano Franchi Bononi, Marco Albertini
Format: Article
Language:English
Published: Wiley 2021-02-01
Series:High Voltage
Online Access:https://doi.org/10.1049/hve.2020.0017