Effects of house load operation on PSA based on operational experiences in Korea

House load operation (HLO) occurs when the generator supplies power to the house load without triggering reactor trips during grid disturbances. In Korea, the HLO capability of optimized power reactor 1000 (OPR1000) plants has prevented several reactor trips.Operational experiences demonstrate the d...

Full description

Bibliographic Details
Main Authors: Hak Kyu Lim, Jong-hoon Park
Format: Article
Language:English
Published: Elsevier 2020-12-01
Series:Nuclear Engineering and Technology
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1738573319308642