Identification of optimal inspection interval via delay-time concept

This paper presents an application of mathematical modeling aimed at managing maintenance based on the delay-time concept. The study scenario was the manufacturing sector of an industrial unit, which operates 24 hours a day in a continuous flow of production. The main idea was to use the concepts...

Full description

Bibliographic Details
Main Author: Glauco Ricardo Simões Gomes
Format: Article
Language:English
Published: Universidade Estadual Paulista 2016-06-01
Series:GEPROS: Gestão da Produção, Operações e Sistemas
Subjects:
Online Access:http://www.gepros.feb.unesp.br/index.php/gepros/article/view/1436/725