Heuristics for production scheduling problem with machining and assembly operations

This work deals with production scheduling problem in an assembly flow shop, having parts machining followed by their subsequent assembly operations. Limited heuristics available on the problem, are based on unrealistic assumption that every part is processed on all machines. In this paper, two heur...

Full description

Bibliographic Details
Main Authors: P.M. Khodke, A Bhongade
Format: Article
Language:English
Published: Growing Science 2012-01-01
Series:International Journal of Industrial Engineering Computations
Subjects:
Online Access:http://www.growingscience.com/ijiec/Vol3/IJIEC_2011_45.pdf