Non-reloading coal transportation in the eastern inclined shaft of “Raspadskaya” mine

The planned increase in the mine output from 6.5 to 13.6 million tons per year has set the task of reconstructing a conveyor transport in the eastern inclined shaft of the Raspadskaya mine. The roadway length is 4100 m; the reduced inclination angle is +7°40´. An attempt was made to combine all the...

Full description

Bibliographic Details
Main Authors: Yurchenko Vadim, Nesterov Valeriy
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/79/e3sconf_coal2021_01027.pdf