DETERMINATION OF ENGINEERING CRITERIA OF DELICE (ANKARA) BRIDGE BY CPM METHOD

In this study, CPM-PERT method is used to find out the minimum time and cost of the bridge constructed in Delice (Ankara) on the Koru river. The reinforced concrete bridge has a 13.70 m support distance and an 8 m platform witdh. In the method; planning, management and cost prices in Early Finish an...