A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR

<p>ENGLISH ABSTRACT: It is reasonable to expect that preparation time is needed to ready a repair facility before a repair can be carried out. A three-unit system with a `preparation time’ for the repair facility is studied in this paper. The steady-state availability of such a system...

Full description

Bibliographic Details
Main Authors: Y.A. Mwanga, J.W. Joubert, V.S.S Yadavalli
Format: Article
Language:English
Published: Stellenbosch University 2012-01-01
Series:South African Journal of Industrial Engineering
Online Access:http://sajie.journals.ac.za/pub/article/view/83