A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR
<p>ENGLISH ABSTRACT: It is reasonable to expect that preparation time is needed to ready a repair facility before a repair can be carried out. A three-unit system with a `preparation time’ for the repair facility is studied in this paper. The steady-state availability of such a system...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/83 |