Study on slope stability due to the influence of excavation of the high-speed rail tunnel

In this study, based on a high-speed railway tunnel project undercrossing slope, model tests and numerical simulation methods were carried out to study the interaction law of tunnel excavation and slope stability. Firstly, the numerical model of finite element analysis and the numerical model of exc...

Full description

Bibliographic Details
Main Authors: Qian Zhang, Jing Wang, Wenyu Wang, Songsong Bai, Peng Lin
Format: Article
Language:English
Published: Taylor & Francis Group 2019-01-01
Series:Geomatics, Natural Hazards & Risk
Subjects:
Online Access:http://dx.doi.org/10.1080/19475705.2019.1568311