Improving the efficiency of well workover solutions for the elimination of behind-the-casing flows
The article deals with the increase of profitability of water shutoff treatment (WST), which is used to eliminate behind-the-casing flows (cross-flow) in production and injection wells. It is presented that modern technologies of water shut-off works have low efficiency (success rate), especially in...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/42/e3sconf_ti2021_01011.pdf |