Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
In fulfilling current electrical energy needs, a power plant unit is operated using various fuels. The biggest cost of the total operating costs of the plant is the cost of using the generator unit fuel which is around 60%, therefore a solution is needed to be able to minimize the costs of using gen...