Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)

In fulfilling current electrical energy needs, a power plant unit is operated using various fuels. The biggest cost of the total operating costs of the plant is the cost of using the generator unit fuel which is around 60%, therefore a solution is needed to be able to minimize the costs of using gen...

Full description

Bibliographic Details
Main Authors: I Made Teguh Winasatria, I Made Mataram, Ida Bagus Gde Manuaba
Format: Article
Language:English
Published: Universitas Udayana 2019-05-01
Series:Majalah Ilmiah Teknologi Elektro
Online Access:https://ojs.unud.ac.id/index.php/JTE/article/view/46339
id doaj-b539f6d17b1c4f84bfd343a58d1829d8
record_format Article
spelling doaj-b539f6d17b1c4f84bfd343a58d1829d82020-11-25T02:36:57ZengUniversitas UdayanaMajalah Ilmiah Teknologi Elektro1693-29512503-23722019-05-0118110511210.24843/MITE.2019.v18i01.P1646339Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)I Made Teguh WinasatriaI Made MataramIda Bagus Gde ManuabaIn fulfilling current electrical energy needs, a power plant unit is operated using various fuels. The biggest cost of the total operating costs of the plant is the cost of using the generator unit fuel which is around 60%, therefore a solution is needed to be able to minimize the costs of using generator fuel in operating the generating unit. Economic Dispatch is a way to overcome the economic operating problem of a power plant by dividing the load on each operating unit so that the minimum generation cost is obtained. The solution to the Economic Dispatch problem can be done using the Fuzzy Logic Controller (FLC) method because the FLC method can make very complex decisions and in its application does not require mathematical models that are too difficult to solve, so the FLC method is expected to minimize the cost of generating electricity. The results of calculating the Economic Dispatch using the FLC method result in a lower total production cost compared to the total total production costs of the System and the Lamda Iteration method for 24 hours on September 30, 2017.https://ojs.unud.ac.id/index.php/JTE/article/view/46339
collection DOAJ
language English
format Article
sources DOAJ
author I Made Teguh Winasatria
I Made Mataram
Ida Bagus Gde Manuaba
spellingShingle I Made Teguh Winasatria
I Made Mataram
Ida Bagus Gde Manuaba
Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
Majalah Ilmiah Teknologi Elektro
author_facet I Made Teguh Winasatria
I Made Mataram
Ida Bagus Gde Manuaba
author_sort I Made Teguh Winasatria
title Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
title_short Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
title_full Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
title_fullStr Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
title_full_unstemmed Economic Dispatch Pada Pembangkit Listrik Tenaga Diesel Gas (PLTDG) Menggunakan Fuzzy Logic Controller (FLC)
title_sort economic dispatch pada pembangkit listrik tenaga diesel gas (pltdg) menggunakan fuzzy logic controller (flc)
publisher Universitas Udayana
series Majalah Ilmiah Teknologi Elektro
issn 1693-2951
2503-2372
publishDate 2019-05-01
description In fulfilling current electrical energy needs, a power plant unit is operated using various fuels. The biggest cost of the total operating costs of the plant is the cost of using the generator unit fuel which is around 60%, therefore a solution is needed to be able to minimize the costs of using generator fuel in operating the generating unit. Economic Dispatch is a way to overcome the economic operating problem of a power plant by dividing the load on each operating unit so that the minimum generation cost is obtained. The solution to the Economic Dispatch problem can be done using the Fuzzy Logic Controller (FLC) method because the FLC method can make very complex decisions and in its application does not require mathematical models that are too difficult to solve, so the FLC method is expected to minimize the cost of generating electricity. The results of calculating the Economic Dispatch using the FLC method result in a lower total production cost compared to the total total production costs of the System and the Lamda Iteration method for 24 hours on September 30, 2017.
url https://ojs.unud.ac.id/index.php/JTE/article/view/46339
work_keys_str_mv AT imadeteguhwinasatria economicdispatchpadapembangkitlistriktenagadieselgaspltdgmenggunakanfuzzylogiccontrollerflc
AT imademataram economicdispatchpadapembangkitlistriktenagadieselgaspltdgmenggunakanfuzzylogiccontrollerflc
AT idabagusgdemanuaba economicdispatchpadapembangkitlistriktenagadieselgaspltdgmenggunakanfuzzylogiccontrollerflc
_version_ 1724797856014925824