RISK ANALYSIS IN MEGAPROJECTS SCHEDULES: A PROPOSAL OF MODEL BASED ON LITERATURE AND SPECIALISTS

The objective of this article is to present a proposal of a model for quantitative risk analysis in megaproject schedules, based on studies from specialized literature and interviews with experts from an energy company. In methodological terms, to obtain the secondary data, a systematic survey of...