Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load

The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is...