Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load
The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is...
Main Authors: | V. N. Radkevich, О. А. Trifonova |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2011-02-01
|
Series: | Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
Online Access: | https://energy.bntu.by/jour/article/view/303 |
Similar Items
-
Determination of Power Requirements for Industrial Enterprise Lighting
by: V. B. Kozlovskaya, et al.
Published: (2008-08-01) -
Determination of Rational Load of Power Transformers under Conditions of Minimum Power Losses
by: V. N. Radkevich, et al.
Published: (2006-02-01) -
Optimization of Statistical Estimation of Half-Hour Load Maximum of Industrial Enterprise
by: V. A. Anischenko, et al.
Published: (2009-08-01) -
About Higher Efficiency Pertaining to Usage of Power Transformers at Industrial Enterprises
by: V. N. Radkevich, et al.
Published: (2008-02-01) -
Time occurrence of the maximum demand of residence load
by: White, Charles E
Published: (1918)