Kick Risk Forecasting and Evaluating During Drilling Based on Autoregressive Integrated Moving Average Model

Timely forecasting of the kick risk after a well kick can reduce the waiting time after well shut-in and provide more time for well killing operations. At present, the multiphase flow model is used to simulate and forecast the pit gain and casing pressure. Due to the complexity of downhole condition...

Full description

Bibliographic Details
Main Authors: Hu Yin, Menghan Si, Qian Li, Jinke Zhang, Liming Dai
Format: Article
Language:English
Published: MDPI AG 2019-09-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/12/18/3540