Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power
A high wind-power penetration level causes increased uncertainty in power system operation because of the variability and limited predictability of wind generation. This paper proposes a novel type of unit commitment (UC) considering spinning reserve and interruptible load (IL) as operating reserve...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2014-07-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/7/7/4281 |