Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power

A high wind-power penetration level causes increased uncertainty in power system operation because of the variability and limited predictability of wind generation. This paper proposes a novel type of unit commitment (UC) considering spinning reserve and interruptible load (IL) as operating reserve...

Full description

Bibliographic Details
Main Authors: Hyeon-Gon Park, Jae-Kun Lyu, YongCheol Kang, Jong-Keun Park
Format: Article
Language:English
Published: MDPI AG 2014-07-01
Series:Energies
Subjects:
Online Access:http://www.mdpi.com/1996-1073/7/7/4281
Description
Summary:A high wind-power penetration level causes increased uncertainty in power system operation because of the variability and limited predictability of wind generation. This paper proposes a novel type of unit commitment (UC) considering spinning reserve and interruptible load (IL) as operating reserve facilities to increase system flexibility for reliable, economical operation. Two uncertainty sources, load and wind generation, were modeled via autoregressive moving averages (ARMA). The formulation of interruptible load was considered in the implementation of unit commitments. Lagrangian relaxation-dynamic programming (LR-DP) was used to solve the unit commitment problem efficiently. The expected energy not supplied (EENS) was regarded as a probabilistic reliability criterion. The effectiveness of the proposed unit commitment was evaluated using an IEEE 118-bus system. The simulation results clearly demonstrated that with demand-side participation, the operating cost was significantly reduced when handling the increased uncertainty due to wind power integration within the required reliability criteria.
ISSN:1996-1073