Shield Equipment Optimization and Construction Control Technology in Water-Rich and Sandy Cobble Stratum: A Case Study of the First Yellow River Metro Tunnel Undercrossing

The Lanzhou Yellow River Tunnel is the first metro shield tunnel that undercrosses the Yellow River in China. It was completed after successfully overcoming several construction challenges, including strata with a high proportion of large-sized sandy cobble stratum being saturated, large-scale sand...

Full description

Bibliographic Details
Main Authors: Fei Ye, Nan Qin, Xiang Gao, Xue-yong Quan, Xian-zhuo Qin, Bing Dai
Format: Article
Language:English
Published: Hindawi Limited 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/8358013