Field Observation and Theoretical Study on an Existing Tunnel Underpassed by New Twin Tunnels

The methodology of the existing displacement control is illustrated taking the shield of twin tunnels of Line 4 underpassing the upline tunnel of existing metro Line 1, for example. Vertical, horizontal, and convergence displacement of the existing tunnel is monitored and analyzed in detail in this...

Full description

Bibliographic Details
Main Author: Qiongfang Zhang
Format: Article
Language:English
Published: Hindawi Limited 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/1598672