A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

We study resource-constrained project scheduling problems with perturbation on activity durations. With the consideration of robustness and stability of a schedule, we model the problem as a multiobjective optimization problem. Three objectives—makespan minimization, robustness maximization, and sta...

Full description

Bibliographic Details
Main Authors: Jian Xiong, Ying-wu Chen, Ke-wei Yang, Qing-song Zhao, Li-ning Xing
Format: Article
Language:English
Published: Hindawi Limited 2012-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2012/786923