Data-Driven Field Observational Method of a Contiguous Bored Pile Wall System Affected by Accidental Groundwater Drawdown

This paper presents the use of a 700 mm-diameter contiguous bored pile (CBP) wall for a main basement deep excavation project with cut-and-cover tunnel. Due to the presence of cement grout columns between piles behind the CBP wall, the main basement was considered to be ‘impermeable’. However, site...

Full description

Bibliographic Details
Main Authors: Elizabeth Eu-Mee Chong, Dominic Ek-Leong Ong
Format: Article
Language:English
Published: MDPI AG 2020-07-01
Series:Geosciences
Subjects:
Online Access:https://www.mdpi.com/2076-3263/10/7/268