Accelerated Benders’ Decomposition for Integrated Forward/Reverse Logistics Network Design under Uncertainty

In this paper, a two-stage stochastic programming modelling is proposed, to design a multi-period, multistage, and single-commodity integrated forward/reverse logistics network design problem under uncertainty. The problem involved both strategic and tactical decision levels. The first stage dealt w...

Full description

Bibliographic Details
Main Authors: Vahab Vahdat, Mohammad Ali Vahdatzad
Format: Article
Language:English
Published: MDPI AG 2017-12-01
Series:Logistics
Subjects:
Online Access:https://www.mdpi.com/2305-6290/1/2/11