Study of anti-swing control of ship cranes based on time delay feedback

2 tons 3 meters ship crane as the research object, establish the complete mathematical model of ship crane, and design the time-delay feedback control algorithm to eliminate payload swing on the basis of the built mathematical model. First, a high-precision potentiometer is used to measure the in-pl...

Full description

Bibliographic Details
Main Authors: Zhongzheng Liu, Zhihong Lin, Mingzhong Wu
Format: Article
Language:English
Published: JVE International 2021-03-01
Series:Journal of Vibroengineering
Subjects:
Online Access:https://www.jvejournals.com/article/21697