Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations
This paper presents a two-stage hybrid flow shop scheduling problem with setup and assembly operations. The proposed study of this paper considers one kind of product with a quantity of demand where each product is made by assembling a set of different parts. At first, the parts are manufactured in...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2013-06-01
|
Series: | International Journal of Industrial Engineering Computations |
Subjects: | |
Online Access: | http://www.growingscience.com/ijiec/Vol4/IJIEC_2013_12.pdf |