Steam Turbine Stage Modernisation in Front of the Extraction Point

The paper presents modernisation of the steam turbine stage situated in front of the turbine extraction point, based on a 225 MW turbine LP stage as an example. The modernised design is intended to better control the steam flow in this area. In the presented design a special ring is used to drive th...

Full description

Bibliographic Details
Main Author: Szymaniak Mariusz
Format: Article
Language:English
Published: Sciendo 2018-06-01
Series:Polish Maritime Research
Subjects:
Online Access:https://doi.org/10.2478/pomr-2018-0062