Steam Turbine Stage Modernisation in Front of the Extraction Point
The paper presents modernisation of the steam turbine stage situated in front of the turbine extraction point, based on a 225 MW turbine LP stage as an example. The modernised design is intended to better control the steam flow in this area. In the presented design a special ring is used to drive th...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2018-06-01
|
Series: | Polish Maritime Research |
Subjects: | |
Online Access: | https://doi.org/10.2478/pomr-2018-0062 |