Joint optimal flood control operation of large scale mixed reservoirs

With the reservoir construction gradually completed, joint operation of reservoir groups is an important measure to realize reservoir flood control potential,but when the river basin is large, the flood channel routing and time-lag cannot be simplified, in addition, the curse of dimensionality is ve...

Full description

Bibliographic Details
Main Authors: Zha Gang, Zhou Jianzhong, Chen Lu, Wang Quansen, Lu Chengwei, Yang Xin, Dai Ling, Zhou Chao
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201824601088