Cooperative Scheduling of AGV and ASC in Automation Container Terminal Relay Operation Mode

The key problem of operation optimization for automated container terminal is the coordinated scheduling of automated quay crane (QC), automated guided vehicle (AGV), and automated stacking crane (ASC). In order to solve this problem, this paper proposed a new method to optimize the scheduling of AS...

Full description

Bibliographic Details
Main Authors: Qinglei Zhang, Weixin Hu, Jianguo Duan, Jiyun Qin
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2021/5764012