Construction Sequence Optimization and Settlement Control Countermeasures of Metro Tunnels Underpassing Expressway

The Chongqing metro line 6 underpass expressway around the city is taken as an engineering background, and the optimal excavation sequence and corresponding control countermeasures for the triangular-distributed three-line metro tunnel underpass expressway are studied. The influences of excavation s...

Full description

Bibliographic Details
Main Authors: Chengzhong Zhang, Qiang Zhang, Ziming Pei, Zhanping Song, Junbao Wang
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/8834368