Construction Sequence Optimization and Settlement Control Countermeasures of Metro Tunnels Underpassing Expressway
The Chongqing metro line 6 underpass expressway around the city is taken as an engineering background, and the optimal excavation sequence and corresponding control countermeasures for the triangular-distributed three-line metro tunnel underpass expressway are studied. The influences of excavation s...
Main Authors: | Chengzhong Zhang, Qiang Zhang, Ziming Pei, Zhanping Song, Junbao Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8834368 |
Similar Items
-
Analysis on the Settlement of Adjacent Buildings Caused by the Underpassing Construction of the Biased Tunnel
by: Zhang Xu, et al.
Published: (2021-01-01) -
Study on the settlement of large-span metro station’s baseplate caused by the tunnels newly built beneath it
by: Runke Huo, et al.
Published: (2019-02-01) -
Investigation of Water Leakage of Metro Segments Caused by Metro Underpass Structures
by: Xiao Liang, et al.
Published: (2021-01-01) -
Influence of Metro Tunnel Excavation on Deformation of Existing Pedestrian Underpass in Changzhou Railway Station Platform
by: Zhenqiang Yang, et al.
Published: (2020-01-01) -
Use of underpasses by animals on a fenced expressway in a suburban area in western Poland
by: Agnieszka Ważna, et al.
Published: (2020-04-01)